09/14/2002

Install larger, corrosion-resistant production conduit.

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
11/04/2011

The ESeal Liner provided the maximum flow area for injector fluids resulting in greater injection volumes and rates due to less friction pressure loss during injection.  The standard conventional scab liner is the 5 in. liner which provides a 4.481 in. ID., while the 5½ x 7 in. ESeal liner...

04/11/2007

A Corrosion across the entire 1,100 ft. of 7 in. casing installed in a natural gas liquids (NGL) storage cavern risked NGL leakage into the surrounding formation.

12/01/2009

In the first stage of the fracturing program, the uppermost fracture sleeve failed - leaving the economic viability of the wells at risk.

02/09/2014

A major operator in the Eagle Ford began a well recovery program to re-activate over 30 wells that stopped producing due to compromised well integrity (leaks).

09/30/2013

An Operator, in the Ardmore Basin, was unable to put a well onto first production due to casing damage at a 5½” to 4½” casing crossover.

10/15/2014

SET technology is the result of a cold-working process that permanently deforms the pipe without any additional heat. The procedure inherent to expanding tubulars takes the steel beyond its elastic limit into the plastic region of the stress-strain curve, while remaining safely below ultimate...