Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

06/08/2011

This casing failure occurred during the 13th stage of the well’s plug-&- perf frac job of it’s 4,500 ft lateral section.  To avoid killing the well with potentially damaging weighted fluids, a rig assist snubbing unit was used to enable live-well operations including milling out the casing...

09/01/2013
In the Marcellus Shale, fracturing rates and pressures can be substantial, but there are other problems also associated with completing these wells, which can promote casing failure or compromise the pressureintegrity of a well. A...
02/09/2014

A major operator in the Eagle Ford began a well recovery program to re-activate over 30 wells that stopped producing due to compromised well integrity (leaks).

09/30/2013

An Operator, in the Ardmore Basin, was unable to put a well onto first production due to casing damage at a 5½” to 4½” casing crossover.

02/12/2009

The Operator utilized Enventure's ESeal Liner expandable technology to isolate zones and provide a high-pressure environment for an aggressive re-frac program. The treatments paid out in ~2 months and increased production 700% where cement squeezes failed.

05/30/2018

The ESeal Flex expandable system is an expandable solution primarily designed for well completions, stimulations, and workovers.

06/01/2018

The ESeal Patch is a single-joint, solid steel, expandable casing patch for operators who need a permanent, inexpensive casing patch solution that reliably restores well integrity.

06/01/2018

In cased-hole environments, ESeal Liner systems provide a solution to mitigate troubled casing intervals in onshore and offshore applications.