Objective

10/12/2008

Isolate multiple zones while maximizing diameter by installing a SET Open-hole Liner with swellable elastomers. The maximum diameter would help reduce fluid friction during high-rate fracturing operations.

12/01/2009

In the first stage of the fracturing program, the uppermost fracture sleeve failed - leaving the economic viability of the wells at risk.

09/30/2013

An Operator, in the Ardmore Basin, was unable to put a well onto first production due to casing damage at a 5½” to 4½” casing crossover.

11/21/2013

An Operator, in the Permian, discovered they did not obtain cement coverage along the entire length of the lateral after cementing their production casing.

05/30/2018

We’ve expanded the Operating Envelope of Expandable Liners for Precise and Reliable Refracturing Applications

The newly enhanced ESeal RF and ESeal RFHT (High-Temp) Refrac Liners provide the industry’s highest strength and temperature ratings...

10/15/2014

SET technology is the result of a cold-working process that permanently deforms the pipe without any additional heat. The procedure inherent to expanding tubulars takes the steel beyond its elastic limit into the plastic region of the stress-strain curve, while remaining safely below ultimate...