Technical Library

01/03/2009

Install a 7-5/8 x 9-5/8 in. SET Openhole Liner (OHL) to isolate higher pressure zones so that mud weight could be reduced to combat lost circulation.

03/30/2009

Save the wellbore by installing a SET® 7-5/8" x 9-5/8" 53.5# Openhole Liner over a 420.86 ft (128.28m) interval to isolate the weak section.

08/01/2011

Challenge: Redevelop an established Gulf of Mexico deepwater field by accessing additional reserves.

03/03/2005

Preserve hole size by implementing a contingency plan that included two SET® solid expandable liners and one conventional API liner run below the well’s planned 11-7/8 in. drilling liner.

03/26/2007

Install a Solid Expandable Tubular (SET®) system to isolate the trouble zones. Retain hole size across all the depleted sands in a narrow pore pressure/fracture gradient environment....

04/11/2014

In the Utica Shale, an Operator drilled three wells and experienced loss zones and formation integrity issues.

04/20/2014

A major Operator in the North Sea required isolation of a high pressure gas-bearing zone to enable safe drilling and logging of the reservoir section, as well as, a solution to isolate a leaking stage tool in the 9-5/8 in. base casing.

03/26/2015

Enhancements to standard SET technology increases the burst and collapse ratings for enhanced performance and reliability in Enventure’s High-Performance Systems.

06/26/2009

3D seismic surveys identified deep exploratory pay interval targets below an existing field development. The Operator wanted to reach these potential pay targets by using the existing well infrastructure (by sidetracking) to drill deeper in the HPHT environment, while maintaining sufficient hole...