Technical Library

Objective

09/14/2002

Install larger, corrosion-resistant production conduit.

04/21/2004

Regain pressure integrity of the 7-3/4 in. production liner for stacked FracPac™ completion operations using Solid Expandable Tubular (SET™) technology.

09/30/1999

Two challenges facing operators as the energy industry moves into the next century are accessing of new reservoirs that currently cannot be reached economically and maintaining profitable production from older fields. Recent advances in one of the oldest and most fundamental areas of exploration...

06/30/1999

Expandable-tubular technology involves a process that expands casing in oil wells drilled in especially challenging environments, such as deepwater. Until now, operators have had to use progressively smallerdiameter pipe as a well was drilled deeper; but expandable-tubular goods are designed for...

09/30/2000

As the oil and gas industry has matured, three broadreaching and long-standing issues that affect virtually every well have assumed heightened importance: conservation of hole size, hydraulic isolation of selected zones, and maximization of well life. All of these issues involve one of the...

09/12/2004

Solid expandable tubular technology presents an opportunity to significantly boost the production capacity of wells by increasing the size of the completion. As such, it offers an economically attractive and environmentally friendly option to breathe new life into gas fields. It is flexible in...

12/29/2009

A major operator was sidetracking out of an existing well to a nearby reservoir.The first attempt to sidetrack utilizing a conventional casing design failed to reach the target depth and damaged the 13-3/8 in. casing.

The casing design for a...

11/01/2010

By ensuring optimal hole size, well designs using solid expandable tubulars have a far-reaching effect on drilling, evaluation, completion and life-of-well solutions. Enventure Global Technology's Kevin Waddell, Jerry Fritsch and Kristaq Mitrushi discuss the growing influence of solid...

02/01/2013

A large independent Operator discovered several leaks and a parted section in the 7 in. production casing from 2,000 ft. to 500 ft. In order to fracture the well, casing integrity had to be restored to handle over 6,000 psi surface fracture pressure to ensure the well could become a viable asset...

Pages