Technical Library

Objective

04/21/2004

Regain pressure integrity of the 7-3/4 in. production liner for stacked FracPac™ completion operations using Solid Expandable Tubular (SET™) technology.

12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

09/09/2003

For years, the reduction of tubular inside diameter (ID), or “telescoping effect,” limited the exploration and production of oil and gas. Using conventional technology, operators faced significant loss of ID in the course of the normal drilling process, during reentry and deepening of existing...

09/12/2004

Solid expandable tubular technology presents an opportunity to significantly boost the production capacity of wells by increasing the size of the completion. As such, it offers an economically attractive and environmentally friendly option to breathe new life into gas fields. It is flexible in...

02/22/2005

During initial completion operations on a deepwater subsea oil well in the Gulf of Mexico, the 7-3/4 in., 46.1 lb/ft casing failed the pressure test in the production liner. Subsequent operations located the casing leak 1,800 ft above the target completion intervals. The original completion was...

12/11/2009

Surface temperature at Tucker Lake in Canada’s Saskatchewan province see temperatures below 40°F below. Below surface steam injection exposes wells to temperatures well exceeding 500°F. One such well, operated by a Calgary-based company, had experienced casing failure at about...

07/16/2010

A leading onshore natural gas producer working Northern Louisiana experienced problems along the vertical section of a horizontal development well.

Enventure deployed two ESeal Liners enabling them to continue the planned completion.

12/29/2009

A major operator was sidetracking out of an existing well to a nearby reservoir.The first attempt to sidetrack utilizing a conventional casing design failed to reach the target depth and damaged the 13-3/8 in. casing.

The casing design for a...

07/14/2011

An operator in the northern Colorado, Piceance basin discovered a part in 4-1/2 in. base casing. The casing split meant they would not be able to complete the lower six stages of the well. The operator initially used conventional methods in an effort to repair the damaged casing to recover the...

Pages