Install larger, corrosion-resistant production conduit.

12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

09/03/2007

Mitigate shale formations, in which loss of returns and sticking are common, by combining SET® expandable tubulars with sidetracking operations in order to reach additional reserves with optimized hole size.

11/09/2006

Install a high-collapse SET® expandable liner to case off the trouble zone.

04/19/2008

Isolate the trouble zone while conserving hole size by planning solid expandable technology into the well design; optimize wellbore trajectory and reduce risk in sidetrack drilling operations.

09/17/2008

Install a SET® Openhole solid expandable system fitted with injection-moulded composite standoff blades.

01/05/2008

In order to facilitate a lower zone fracture treatment, three sets of perforations required a high-pressure, gas-tight isolation treatment that would maximize casing ID for completion tools. The solution provided a successful, gas-tight isolation of the three sets of perforations...

09/30/1999

Two challenges facing operators as the energy industry moves into the next century are accessing of new reservoirs that currently cannot be reached economically and maintaining profitable production from older fields. Recent advances in one of the oldest and most fundamental areas of exploration...