09/14/2002

Install larger, corrosion-resistant production conduit.

12/29/2007

Challenge: Design and implement a field-level remediation plan using cased-hole SET® Solid Expandable Tubular technology to facilitate production restoration.

09/03/2007

Mitigate shale formations, in which loss of returns and sticking are common, by combining SET® expandable tubulars with sidetracking operations in order to reach additional reserves with optimized hole size.

11/09/2006

Install a high-collapse SET® expandable liner to case off the trouble zone.

10/15/2008

Optimize project economics, well design and drilling efficiency with application of SET solid expandable technology.

10/12/2008

Isolate multiple zones while maximizing diameter by installing a SET Open-hole Liner with swellable elastomers. The maximum diameter would help reduce fluid friction during high-rate fracturing operations.

05/16/2004

Accurately install SET® Openhole Clad solid expandable systems featuring water-sensitive swelling elastomer seals. The installation further proved SET® technology applied for the first time a year earlier in another field.

 

09/30/1999

Two challenges facing operators as the energy industry moves into the next century are accessing of new reservoirs that currently cannot be reached economically and maintaining profitable production from older fields. Recent advances in one of the oldest and most fundamental areas of exploration...