04/21/2004

Regain pressure integrity of the 7-3/4 in. production liner for stacked FracPac™ completion operations using Solid Expandable Tubular (SET™) technology.

06/30/2000

Optimizing the casing program is one of the most critical factors in well design for deepwater applications. Conventional design often dictates that very large surface casing be used to allow passage of a high number of subsequent casing strings telescoping down in size that are required to...

02/22/2005

During initial completion operations on a deepwater subsea oil well in the Gulf of Mexico, the 7-3/4 in., 46.1 lb/ft casing failed the pressure test in the production liner. Subsequent operations located the casing leak 1,800 ft above the target completion intervals. The original completion was...

12/29/2009

A major operator was sidetracking out of an existing well to a nearby reservoir.The first attempt to sidetrack utilizing a conventional casing design failed to reach the target depth and damaged the 13-3/8 in. casing.

The casing design for a...

08/01/2011

Challenge: Redevelop an established Gulf of Mexico deepwater field by accessing additional reserves.

03/27/2015

A Norwegian Sea Operator was unable to drill into a depleted reservoir with a planned 12-1/4 in. BHA, which left a short section of shale cap rock that needed to be isolated to enable use of water-based mud as the reservoir drill fluid.